Skip to main content
G

Project Atlas

20 MW colocation — balanced · v1

AM

Demonstration dataset. Fictional parcel and infrastructure records. Not suitable for acquisition or engineering decisions.

What are you trying to build?

The facility archetype loads editable defaults. Change any of them — they are assumptions, not facts.

MW
MW

Assumptions

Power usage effectiveness

%
29.9 MWindicative site loadAssumption

20 MW IT × 1.3 PUE × 1.15 resilience. This figure sizes the screening question; it is not an engineering load calculation.

Draft saved