Suitability
77/ 100
Promising
Build Confidence
42/ 100
Directional only
Why it ranks here
Derived from the calculation, not written by an assistant.
- Power asset proximity scores 90 of 100 and contributes 11.03 points.
- Indicative voltage fit scores 90 of 100 and contributes 6.30 points.
- No project-specific grid capacity or connection evidence is held. Power signals are proximity-based only.
- Network queue pressure scores 25 of 100 against this requirement.
- Relative land cost band scores 30 of 100 against this requirement.
Missing evidence 3
Each gap is recorded explicitly. None of them has been counted as a zero.
Grid capacity and connection offer
Raise a project-specific connection enquiry with the network operator for the indicative site load.
Indicative connection date
Request an indicative connection programme against the target ready-for-service date.
Carrier service quotation
Request written quotations from at least two carriers for the parcel.
Columns: value · normalised score · weight within group · factor confidence. Select any row to open its calculation and evidence.