Demonstration dataset. Fictional parcel and infrastructure records. Not suitable for acquisition or engineering decisions.
Suitability
62/ 100
Marginal
Build Confidence
40/ 100
Directional only
Why it ranks here
Derived from the calculation, not written by an assistant.
- Flood risk screen scores 95 of 100 and contributes 3.80 points.
- Gross area headroom scores 100 of 100 and contributes 3.75 points.
- No project-specific grid capacity or connection evidence is held. Power signals are proximity-based only.
- Heat reuse opportunity scores 30 of 100 against this requirement.
- Mapped fibre route proximity scores 37 of 100 against this requirement.
Missing evidence 4
Each gap is recorded explicitly. None of them has been counted as a zero.
Grid capacity and connection offer
Raise a project-specific connection enquiry with the network operator for the indicative site load.
Carrier route confirmation
Confirm physical route positions and duct availability with named operators.
Adopted policy position
Review the adopted and emerging local plan position for this use.
Adopted policy stance towards this use
Obtain a project-specific record for adopted policy stance towards this use.
Columns: value · normalised score · weight within group · factor confidence. Select any row to open its calculation and evidence.