Demonstration dataset. Fictional parcel and infrastructure records. Not suitable for acquisition or engineering decisions.
Suitability
67/ 100
Promising
Build Confidence
42/ 100
Directional only
Why it ranks here
Derived from the calculation, not written by an assistant.
- Power asset proximity scores 79 of 100 and contributes 9.65 points.
- Indicative voltage fit scores 90 of 100 and contributes 6.30 points.
- No project-specific grid capacity or connection evidence is held. Power signals are proximity-based only.
- Ownership complexity scores 20 of 100 against this requirement.
- Relevant planning precedent scores 40 of 100 against this requirement.
Missing evidence 4
Each gap is recorded explicitly. None of them has been counted as a zero.
Grid capacity and connection offer
Raise a project-specific connection enquiry with the network operator for the indicative site load.
Independent carrier diversity
Verify genuinely diverse duct routes with at least two independent carriers.
Comparable planning precedent
Review comparable determinations and any refusal reasons in the authority.
Ground conditions
Commission a geotechnical desk study and intrusive survey.
Columns: value · normalised score · weight within group · factor confidence. Select any row to open its calculation and evidence.