Project Atlas

20 MW colocation — balanced · v1

AM

Demonstration dataset. Fictional parcel and infrastructure records. Not suitable for acquisition or engineering decisions.

Fixture mode — no live sources connectedSnapshot 2026-08-14Scoring dc-screening-balanced 0.1.0-demo18 demo sourcesData and methodology
Results

Derwent Campus

EM-SYN-003 · Demonstration parcel · East Midlands Central · rank 8

EligibleWatching

Suitability

67/ 100

Promising

Build Confidence

42/ 100

Directional only

Why it ranks here

Derived from the calculation, not written by an assistant.

  • Power asset proximity scores 79 of 100 and contributes 9.65 points.
  • Indicative voltage fit scores 90 of 100 and contributes 6.30 points.
  • No project-specific grid capacity or connection evidence is held. Power signals are proximity-based only.
  • Ownership complexity scores 20 of 100 against this requirement.
  • Relevant planning precedent scores 40 of 100 against this requirement.

Missing evidence 4

Each gap is recorded explicitly. None of them has been counted as a zero.

  • Grid capacity and connection offer

    Raise a project-specific connection enquiry with the network operator for the indicative site load.

  • Independent carrier diversity

    Verify genuinely diverse duct routes with at least two independent carriers.

  • Comparable planning precedent

    Review comparable determinations and any refusal reasons in the authority.

  • Ground conditions

    Commission a geotechnical desk study and intrusive survey.

Group score 75.3Group weight 35%Evidence coverage 100%

Columns: value · normalised score · weight within group · factor confidence. Select any row to open its calculation and evidence.