Skip to main content
G

Project Atlas

20 MW colocation — balanced · v1

AM

Demonstration dataset. Fictional parcel and infrastructure records. Not suitable for acquisition or engineering decisions.

Fixture mode — no live sources connectedSnapshot 2026-08-14Scoring dc-screening-balanced 0.1.0-demo18 demo sourcesData and methodology
Results

Soar Technology Park

EM-SYN-002 · Demonstration parcel · East Midlands Central · rank 2

EligibleLonglisted

Suitability

77/ 100

Promising

Build Confidence

42/ 100

Directional only

Why it ranks here

Derived from the calculation, not written by an assistant.

  • Mapped fibre route proximity scores 80 of 100 and contributes 4.82 points.
  • Route diversity proxy scores 90 of 100 and contributes 4.72 points.
  • No project-specific grid capacity or connection evidence is held. Power signals are proximity-based only.

Missing evidence 2

Each gap is recorded explicitly. None of them has been counted as a zero.

  • Grid capacity and connection offer

    Raise a project-specific connection enquiry with the network operator for the indicative site load.

  • Connection route feasibility

    Commission a connection route study including wayleaves and crossings.

Group score 63.3Group weight 35%Evidence coverage 100%

Columns: value · normalised score · weight within group · factor confidence. Select any row to open its calculation and evidence.